Schedule
How we arrive at a delivery date. This is the calendar we work in.
Every delivery date is checked against the calendar before you see it. This is how.
VIS-2608-4471 · VOLT
20 products · catalog
- Received
- In production
- Checked
- Delivered
The first images are in
2 waiting for your approval · 1 back for revision
-
Product 1 · front Approved
-
Product 1 · back Waiting for you
-
Product 2 · front Revision
-
Product 2 · detail Waiting for you
All 80 images of this order arrive the same way — 4 per product. You approve them one at a time and the rest of the delivery keeps moving.
We check the calendar before we offer you a date.
The order form only offers dates the studio can still hold.
The four rules the planning runs on
- Counted in products, not ordersA studio day holds 14 products; a reserved window is 2 consecutive open studio days.
- Room for small orders3 of every 14 stay free for small orders.
- Size decides, at 10 productsFrom 10 products an order holds a committed date. Smaller orders run in the normal turnaround.
- Nothing is promised twiceA window that is taken disappears from the picker at once.
What the date picker asks
14 products per studio day, 3 of which stay free for small orders. A window is 2 consecutive open studio days.
- Mon 3 Aug 8 / 11 Too soon
- Tue 4 Aug 11 / 11 Too soon
- Wed 5 Aug 11 / 11 Too soon
- Thu 6 Aug 6 / 11 Too soon
- Fri 7 Aug 2 / 11 Room
- Sat 8 Aug 0 / 11 Room
- Sun 9 Aug 0 / 11 Room
- Mon 10 Aug 0 / 11 Window
- Tue 11 Aug 0 / 11 Window
- Wed 12 Aug 11 / 11 Full
- Thu 13 Aug 0 / 11 Room
- Fri 14 Aug 0 / 11 Room
The last 3 of every day cannot be booked as a window. They stay for orders running in the normal turnaround. Today and the 3 days after it are not production time: the photos have to be in and looked at before a date means anything.
20 products ask for 10 on each day of the window, so it needs two days that are completely free. Friday 7 has room, but not enough — so that window is not offered.
This is why it is counted in products and not in orders: the answer depends on what has to be made, not on how many rows are in the table.
If nothing fits inside the horizon, you get no date. There is deliberately no "closest we can do", because that is the date that has to be moved later.
Work back from your launch date.
From 10 products we reserve your days in the calendar, so the date goes in writing.
- 01 Your launch date The day the collection goes live. We count back from here.
- 02 Your reserved date From 10 products, reserved when you order and fixed once you have paid. Only force majeure can move it.
- 03 Your upload day The day you send the photos. Your part is done.
One table, every order.
Our side: a list of orders, the state each one is in, and the calendar.
What sits in that table
- Every order, one row
- Reference, brand, products, window and state.
- Revisions come to the top
- With the note the client wrote.
- One move, both sides
- The studio and your portal update together.
Revision requests
1 open
VIS-2608-4462 · Studio Halte Product 3 · back came in today 13:58
The back is turned slightly, which makes the logo sit crooked.
The note is here as the client wrote it. Nothing is summarised and nothing is turned into a category.
Orders
| Reference | Brand | Products | Window | Status |
|---|---|---|---|---|
| VIS-2608-4471 | VOLT | 20 | 10 – 11 Aug | In production |
| VIS-2608-4468 | Nord Label | 12 | 3 – 4 Aug | Being checked |
| VIS-2608-4462 | Studio Halte | 10 | 4 – 5 Aug | Revision |
| VIS-2607-9920 | Kade 4 | 4 | — | Awaiting payment |
Every order sits on the same list, in the same table. There is no separate row for big accounts.
One write
We set it
today 13:58
VISUAILS Studio shows
Revision requested · product 3 · back
today 13:58
The same time twice, because it was not written twice. The status change and the timeline the client sees are the same write — which is why the portal cannot fall behind.
The last step: our image editors.
Nothing is delivered automatically. Our image editors look at every image before it goes out. Every approval and revision is logged with a date.
What this does not do.
- No date it has not clearedA full calendar offers the next free window — never a yes and then a reschedule.
- No rushing past the reviewAn order that is not right does not ship on time; it ships right.
- No room that is not thereWhen the studio is full, it says so.